Thyssenkrupp Levant Stair Lift Installation Manual Top ^hot^ Jun 2026

: The track is made of anodized aluminum and uses a rack and pinion drive system. At the top end, a trim cap is typically removed to access internal mechanical and "dead" stops held by screws.

: Required for adjusting the seat, chassis components, and rail stops.

: Attach the seat mounting bracket, followed by the seat and footrest. Safety Wiring thyssenkrupp levant stair lift installation manual top

Position the rail on the stairs, ensuring it is either mounted to the wall or the stair treads using landing brackets.

Test the sensitive edges on the footrest and carriage. Gently press them while the lift is moving; the unit must stop instantly. : The track is made of anodized aluminum

Ensure the upper mechanical stop is firmly bolted to prevent the carriage from over-traveling the rail. 2. Electrical & Charging (Top Station)

Final securing should only occur after a successful test ride to ensure the position is optimal. www.easyliftingstairlift.co.uk : Attach the seat mounting bracket, followed by

It is recommended to have an authorized technician perform general maintenance and lubrication every 6 to 12 months.

The Levant operates on a 24V DC battery circuit charged continuously via the rail charging strips. Tools and Equipment Required