Pwd Dsr 2017-18 Maharashtra Jun 2026

Pricing metrics for clearing soil, soft murum, hard murum, and breaking hard rock with or without blasting.

The PWD DSR 2017-18 Maharashtra stands as a vital document in the chronology of the state's infrastructure development. It successfully navigated the complex economic landscape following the implementation of GST and demonetization. By standardizing rates, it ensured that public funds were utilized efficiently and that the tendering process remained competitive and transparent. While no static document can perfectly capture a volatile market, the DSR 2017-18 provided the necessary stability and legal framework for the execution of thousands of crores worth of public works, contributing significantly to the connectivity and built environment of Maharashtra. It remains a testament to the technical and administrative effort required to govern public infrastructure effectively.

Earthwork, rock cutting, and excavation for foundations. pwd dsr 2017-18 maharashtra

: Rates typically included an initial 5 km lead for most materials.

The schedule relied on basic rates for essential construction materials. According to the Maharashtra PWD Material Rates 2017-18 , benchmarks included: : ₹4,200 per Metric Ton (M.T.). Steel (TMT-FE-500) : ₹33,425 per M.T.. Structural Steel : ₹34,834 per M.T.. Bitumen (VG-10) : ₹23,140 per M.T.. 4. Technical & Electrical Highlights Pricing metrics for clearing soil, soft murum, hard

By establishing baseline rates for materials, labor, and machinery, the DSR 2017-18 ensures transparency and fiscal compliance during the crucial transition into India's Goods and Services Tax (GST) era. Key Structural Highlights of the 2017-18 DSR

The DSR 2017-18 included extensive coverage of road construction items, including: By standardizing rates, it ensured that public funds

| Particulars | 2016-17 | 2017-18 | | --- | --- | --- | | Budget (₹ crore) | 13,456 | 15,734 | | Expenditure (₹ crore) | 12,351 | 14,351 | | % of expenditure to budget | 92% | 91% |

The 2017-18 DSR is divided into chapters to facilitate organized cost estimation:

The DSR 2017-18 systematically captured 36 districts—from the urban intensity of Mumbai Suburban to the naxal-affected terrain of Gadchiroli.